fondo-09Our Datacenter,  located  in  the historical centre of the Autonomous City of Buenos Aires is qualified as "Tier 3" in  accordance with the Ultimate  Institute's standards and complies with  the  Communication  A 4609 of the Central Bank  in terms of infrastructure data processing Centers and related  communications  concerning    to matter (e.g. 4793, 4904, etc).


The building has a floor area of 5500 meters square and is  divided into  four  floors,  which  were  designed  with the best engineering practices used in the United States and Europe. It has 1500 square meters of technical floor at the time of the proposal. The engineering of our building was provided by Ericson and the construction was performed by Techint, two companies with extensive experience in this type of constructions.

Its design is modular,  allowing you to maintain low operating  costs, it  has  redundancy in all systems ("no single point of failure").

Our Datacenter is built using the best technology and installing market leading  brands  in  each of its major systems, assuring a low maintenance cost and an easy scalability with minimal  marginal  investment in the operation and in the environmental protection.
 

 • Building located near the financial district of the city (SanTelmo).

 • Easy access by public transport.

 • Access to multiple telecommunications providers and connectivity.

 • Access to the building from three streets.

 • High security environment not only protects the equipment, but also the most valuable content, "the people".

 • Redundant power systems and climate.

 • Strict control of access to the building.